Grid expansion and grid conversion – fit for the future

A stable and efficient energy grid is the basis for a secure supply.

We support you from the initial analysis to implementation – always with an eye on efficiency, costs, and future security.

Whether it's modernizing existing structures or creating completely new grid sections, we ensure that all components are optimally coordinated.

Excerpt from our references: Planner for 20 kV medium-voltage switchgear (Energienetze Offenbach)

I was responsible for the overall planning of medium-voltage systems for the UW Triebwerk, UW Merianstraße and UW Zellhausen projects. The focus was on safe and economical implementation in 20 kV, seamless coordination with all parties involved, and a robust tender and schedule basis. From the early concept phase to the design of gas-insulated stations to EU-wide tendering, I drove the projects forward in a structured manner – with clear processes, clean documentation and practical solutions for operation.

Key areas of expertise

  • Specifying requirements: Analysing technical specifications – always aligned with the project objective.

  • Designing medium-voltage substations: Designing gas-insulated network and transformer substations in 20 kV and planning them in AutoCAD.

  • Planning replacement buildings: Planning replacement construction measures in terms of technology and scheduling.

  • Preparing tenders: Creating complete tender documents, including detailed service descriptions for EU-wide tenders.

  • Planning areas and rooms: Determining space requirements, creating layouts and coordinating across trades.

  • Coordinating suppliers: Coordinating with 20 kV system suppliers (e.g. Siemens, Betonbau) regarding interfaces, execution and deadlines.

  • Secure costs: Provide reliable cost estimates as a basis for budget planning.

  • Consider operational safety: Plan for pressure relief and safe routing in the event of a short circuit.

  • Cover HOAI phases: Services in accordance with HOAI LP 2–6.

  • Control time and progress: Create and update project plans; systematically maintain LOP lists and meeting reports.

We use cookies

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.